Commercial Air Test — Checklist Before Site Visit

Please ensure all items below are completed before our engineer arrives on site. Adequate preparation is essential to achieving a successful air tightness test result for your commercial building.

Items to Complete Before the Test

  • All ventilation outlets above 2.5 metres high must be sealed before we arrive on site (including air conditioning vents and grilles)
  • All external doors fitted and closed
  • All external windows fitted and closed
  • All internal doors open
  • All drainage traps filled with water
  • Loft access hatch closed
  • Fireplaces sealed / flues blocked
  • All trickle vents closed (not sealed) — including Velux windows
  • All builders work fully completed
  • All sockets and light switches fitted
  • All downlighters fitted
  • All cracks or holes in the fabric of walls, floors or ceilings caulked or filled before the engineer arrives on site
  • Mains 240V electricity available on site

Do Not Seal These Items

  • Seals to external doors
  • Seals to windows or sills
  • Seals to drains or sills
  • Seals to trickle vents
  • Seals to loft access hatch
Important Notice

The engineer’s site visit is allocated a maximum of 90 minutes. If the visit exceeds this time, a surcharge of £90 per hour will be applied.